Skip to content
 

"Saved 2-3 weeks on our construction schedule by using this product."

Learn More
Aerial view of ALPS Cleburne Apartments under construction in Cleburne, Texas
Field Installations

Proven Across The Country

Home2 Suites by Hilton Jacksonville exterior rendering
Jacksonville, Florida

Home2 Suites by Hilton


3/4” MAXTERRA® Subfloor Panels

Structural Floor System over CFS Framing

Thornton Senior Living jobsite
Orlando, Florida

Thornton Senior Living


3/4” MAXTERRA® Subfloor Panels

Structural Floor System over CFS Framing

Artem on Gay St jobsite
Columbus, Ohio

Artem on Gay St


3/4” MAXTERRA® Subfloor Panels

Structural Floor System over Wood Framing

Pennsylvania data center exterior
Pennsylvania

Data Center


 3/4” MAXTERRA® Subfloor Panels 

 Structural Floor System

Aerial view of TownPlace Suites by Marriott under construction in Gulf Shores
Gulf Shores, Alabama

TownPlace Suites by Marriott Hotel


3/4” MAXTERRA® Subfloor Panels 

Structural Floor System

Aerial view of the Stadium Press Box renovation in Tuscaloosa
Tuscaloosa, Alabama

Stadium Press Box Renovation


3/4” MAXTERRA® Subfloor Panels  

 Structural Floor System 

Suntree Assisted Living and Transitional Memory Care in Melbourne
Melbourne, Florida

Suntree Assisted Living and Transitional Memory Care


3/4” MAXTERRA® Subfloor Panels  

Structural Floor System

MAXTERRA floor panels at the Metro Properties multifamily project in Dover
Dover, Delaware

Metro Properties
Multifamily


1/2” MAXTERRA® Flooring Underlayment  

Underlayment over OSB Subfloor Panels 

Wood-framed multifamily residential construction in Louisville
Louisville, Kentucky

Multifamily Residential Development


1/2” MAXTERRA® Flooring Underlayment  

Underlayment over OSB Subfloor Panels 

Interior construction of a Geoship geodesic dome in California
California

Geoship Geodesic Dome


3/4” MAXTERRA© Subfloor Panels  

Structural Wall and Roof Panels 

Wood-framed multifamily construction in Cleveland
Cleveland, Ohio

Multifamily Development


1/2” MAXTERRA® Flooring Underlayment   

 Underlayment over OSB Subfloor Panels 

Interior of Tarchitects Dance Studio in Atlanta
Atlanta, Georgia

Tarchitects Dance Studio


3/4” MAXTERRA® Subfloor
Panels
 

Structural Floor System Over CFS Framing 

Single Trade Installation With No Curing Time

Learn More
Subfloor being installed

What MAXTERRA® Delivers — in Numbers

1800+

Supported by a national distribution network with more than 1,800 locations that provide dependable product availability.

24” O.C.

Rated for 24” O.C. and installed with standard tools and your existing crew, MAXTERRA® structural floor and wall panels deliver the performance your projects demand with fewer materials and labor.

0

ASTM E84 tested with 0 flame spread and 0 smoke developed for maximum fire performance.

20%

Savings vs. traditional wet gypsum assemblies.

#1

MAXTERRA® is the most highly certified MgO panel on the market and the only one with an EPD in North America.

Still pouring a wet slurry for your underlayment?
It’s time to
Skip-The-Gyp™