Home2 Suites by Hilton
St. Johns, FL
Hotel
3/4-inch MAXTERRA® MgO Structural Floor Panels
Cold-formed steel (CFS)
St. Johns, FL
137
Cerris Builders
“Noncombustible building systems are often viewed more favorably from a risk perspective, and some projects have experienced insurance premium reductions of up to 35% when compared to conventional assemblies.”
Stanley Adwell, Founder and CEO, Intellisteel

Builder
Cerris Builders
Developers
Cross Regions Group and Ideal Hospitality Investments
Architect
Davenport Consulting Group
CFS Framer
Intellisteel Group
MAXTERRA® Installer
RTC Construction
Building Materials Supplier
Foundation Building Materials, Jacksonville, FL
Home2 Suites by Hilton at The Fountains at St. Johns is an $18.7 million project in St. Johns, Florida, with 137 rooms across four stories totaling 81,858 square feet. The hotel was built with cold-formed steel (CFS) framing from Intellisteel Group, a valued NEXGEN partner based in Groveland, FL, and MAXTERRA® MgO Non-Combustible Single Layer Structural Floor Panels. The CFS and MAXTERRA combination creates a noncombustible, mold- and mildew-resistant structural system that provides guests with quieter rooms and owners with insurance savings and lasting durability.
NEXGEN’s Skip-The-Gyp™ approach allows project teams to meet code and most project requirements without wet-laid gypsum in appropriate MAXTERRA® floor-ceiling assemblies. For this hotel, however, the team opted to add a 1-inch layer of wet-laid gypsum over the MAXTERRA® subfloor panels for even higher sound performance.
With or without wet-laid gypsum, floor-ceiling assemblies built with MAXTERRA® structural floor and underlayment panels deliver superior structural strength, fire resistance, and sound control. Benefits include:
- The industry’s most cost-effective 2-hour floor/ceiling assembly – UL H531.
- Eliminating the use of wood sheathing with mold and mildew resistant MgO cement panels.
- Reducing the number of ceiling gypsum layers from two or three to just one.
- Replacing costly mineral wool insulation with lower cost fiberglass batt insulation.
- Extending truss or joist spacing to 24”, reducing material and labor costs while saving time.
- Eliminating wait times and potential weather delays caused by wet-laid gypsum.
- Reduced builders risk insurance costs due to the use of noncombustible materials.
Continue Exploring
Explore MAXTERRA® Structural Floor Panels