Project Type

Hotel

Product

3/4-inch MAXTERRA® MgO Structural Floor Panels

Framing Type

Cold-formed steel (CFS)

Location

St. Johns, FL

Rooms

137

Builder

Cerris Builders

“Noncombustible building systems are often viewed more favorably from a risk perspective, and some projects have experienced insurance premium reductions of up to 35% when compared to conventional assemblies.”

Stanley Adwell, Founder and CEO, Intellisteel

MAXTERRA® MgO structural floor panels supported by cold-formed steel trusses at Home2 Suites St. Johns.
Construction crew on MAXTERRA® floor panels and cold-formed steel wall framing at Home2 Suites St. Johns.

Builder
Cerris Builders

Developers
Cross Regions Group and Ideal Hospitality Investments

Architect
Davenport Consulting Group

CFS Framer
Intellisteel Group

MAXTERRA® Installer
RTC Construction

Building Materials Supplier
Foundation Building Materials, Jacksonville, FL

Home2 Suites by Hilton at The Fountains at St. Johns is an $18.7 million project in St. Johns, Florida, with 137 rooms across four stories totaling 81,858 square feet. The hotel was built with cold-formed steel (CFS) framing from Intellisteel Group, a valued NEXGEN partner based in Groveland, FL, and MAXTERRA® MgO Non-Combustible Single Layer Structural Floor Panels. The CFS and MAXTERRA combination creates a noncombustible, mold- and mildew-resistant structural system that provides guests with quieter rooms and owners with insurance savings and lasting durability.

NEXGEN’s Skip-The-Gyp™ approach allows project teams to meet code and most project requirements without wet-laid gypsum in appropriate MAXTERRA® floor-ceiling assemblies. For this hotel, however, the team opted to add a 1-inch layer of wet-laid gypsum over the MAXTERRA® subfloor panels for even higher sound performance.

With or without wet-laid gypsum, floor-ceiling assemblies built with MAXTERRA® structural floor and underlayment panels deliver superior structural strength, fire resistance, and sound control. Benefits include:

  • The industry’s most cost-effective 2-hour floor/ceiling assembly – UL H531.
  • Eliminating the use of wood sheathing with mold and mildew resistant MgO cement panels.
  • Reducing the number of ceiling gypsum layers from two or three to just one.
  • Replacing costly mineral wool insulation with lower cost fiberglass batt insulation.
  • Extending truss or joist spacing to 24”, reducing material and labor costs while saving time.
  • Eliminating wait times and potential weather delays caused by wet-laid gypsum.
  • Reduced builders risk insurance costs due to the use of noncombustible materials.

Continue Exploring

Explore MAXTERRA® Structural Floor Panels

See CFS + MAXTERRA® at Trilogy Senior Center

Get a Price for Your Project

  • Video

    On the Jobsite at Home2 Suites St. Johns with NEXGEN’s Ryan Miller