Voice of Deliverance Church
Vineland, NJ
Church Construction
MAXTERRA® MgO Non-Combustible Single Layer Structural Floor Panels
Cold-Formed Steel (CFS) Framing
Vineland, NJ
“I love working with it.”
Henry, Project Manager
at Hannah Construction
Grace Construction Management Company
Installer
Hannah Construction
Distributors
Capitol Building Supply, Inc and Frensco Building Products
MAXTERRA® Sales Rep
MCQ Sales
Located in Vineland, NJ, this new church is being constructed after the loss of the previous building to fire. Grace Construction Management Company selected a system designed for strength, safety, and long-term resilience, combining cold-formed steel (CFS) framing with MAXTERRA® MgO Non-Combustible Single Layer Structural Floor Panels.
CFS framing and MAXTERRA® subfloor panels share the qualities builders rely on most: structural strength, fire resistance, and proven durability. Along with these performance benefits, MAXTERRA® panels can also be installed by the same crew framing the building. This reduces the number of trades on site, streamlines coordination, and lowers labor costs. MAXTERRA® panels can be fastened in conditions that stop wet laid gypsum and eliminate the curing delays that slow traditional assemblies. The result is a floor system that keeps the project moving forward.
With MAXTERRA®, crews can frame, fasten, and keep building.